The biggest risk in a columbarium built out in one go is not that it fails to sell, but that it sells 30% and still pays air conditioning dehumidification and staffing for the whole hall. Modular zoning exists to solve exactly that: cut the niches into zones of 200–400 that can be switched on and off independently, and run only the zone in use.

The lower bound comes from operating cost. Whichever size a niche zone is, the fixed overheads of lighting dehumidification, staffing and cleaning remain. Too small, and the cost per niche doubles.
The upper bound comes from experience. Beyond 400, a zone needs a depth of more than 30 m, and the niches at the back see no daylight and hear nothing from the entrance; families start to say it feels like a warehouse.
Two hundred and fifty to three hundred and fifty is the comfortable band: about 300–450 m², 60–80 m of aisle, and a cleaner can walk it in 40 minutes.
Zoning is not a line drawn on a plan. For a zone to open alone it needs three independently controllable conditions.
First, separate lighting and air conditioning circuits. One distribution circuit per zone, one fan coil or one fresh-air branch, with valves and switches located outside the zone.
Second, dehumidification by zone. If the whole columbarium runs on one unit, opening one zone drags the entire hall and energy use jumps immediately. Provide a small dehumidifier per zone, or a main with motorised dampers.
Third, access control. Unopened zones must be lockable, and the lock must not obstruct escape — use normally closed fire doors with magnetic locks released on fire alarm.
Do not take zone partitions to the ceiling.
Full-height partitions cut the air path and complicate sprinkler zoning. A 1.8 m wall blocks the sightline while keeping the air moving, and it lets the niche zones still read as one columbarium.
Make the wall 120–150 mm thick and ease the top edge with a 30 mm round — a hand resting on it as someone walks past should not be pinched.
Once zoned, each zone needs its own cross aisle at not less than 1.5 m clear.
That means zoning consumes area. At 300 niches per zone, the extra aisles take about 8–12% of the zone, equivalent to 20–35 niche positions.
Accept this at scheme stage. What you get in return: open only one or two zones in phase one, leave the rest unlit and undehumidified, and annual running cost drops by 40–60%.

Set the numbering once zoning is decided; never leave it to the sales team later.
Use four segments — zone, row, column, tier — with letters such as A, B, C for zones and reserve through F or G. Do not put "phase one" or "phase two" in a niche number. Phasing is a sales concept, not a spatial one, and writing it into the numbering ties your own hands.
Hold 5% spare numbers inside each zone for later additions. That is what saves you during an extension.
My advice: any columbarium with more than 800 niches on a floor should be zoned, in bands of 300.
If phase one is meant to open 1,000 niches, cut three zones, open two, and for the third fit the doors and the grilles but no dehumidifier. Empty niches are not embarrassing; paying to dehumidify an empty hall is.
More zones is not better. Under 800 niches in total, two zones are enough; under 400, not cutting at all is more economic.
The reason is services Each additional zone needs its own dehumidification and fresh-air branch, at 80,000–150,000 yuan per zone in equipment. With four or five zones, the capital cost exceeds the electricity saved over ten years.
There is also a hidden cost: once zoned, every zone has niches against a partition, and positions against a wall feel worse, typically selling 3–5% lower.
Q: Does zoning make it harder for families to find a niche?
A: Yes, so signage has to keep up. Put a 1.2 m wide row plan at each zone entrance, marking the row number range in that zone.
Q: Can a zone be only 100 niches?
A: It can, but the running cost does not spread. Energy per unit area in a 100-niche zone runs about 1.8 times that of a 300-niche zone.
Q: Do partitions need fire services approval?
A: A 1.8 m low wall does not constitute a fire compartment and normally needs no separate submission. Take it to full height in fire-rated board and it is treated as a compartment.
Q: Can zoning be retrofitted to an existing columbarium?
A: Yes, but the services branches need rewiring. It costs less than redoing the fit-out; the niches do not move, the pipes above the ceiling do.

Modular zoning comes down to four numbers: 200–400 niches per zone, around 300 m², aisles taking 8–12%, and running cost down 40–60%. The niches of a columbarium are sold one cell at a time while the hall opens all at once — zoning is what brings those two rhythms into step.